Projects > Public Works Projects
| INISHBOFIN COASTAL PROTECTION WORKS & PIER IMPROVEMENT WORKS, Inishbofin, Co. Galway. |
This project consists of the construction of a 300m long retaining wall in precast and in-situ concrete, the dredging of approximately 30,000m3 of salt, sand and gravel which will be placed behind the concrete retaining wall and the formation of a slope between the top of the wall and the top of the existing cliffs. The work is topped off with a precast revetment surface, and improvement works was carried out to the existing quay, including provision of a new slipway. Because of the location of the project on an offshore island, significant logistical obstacles must be overcome, including extensive off site precasting, on site concrete production, and restricted plant availability. The dredge element is heavily restricted by environmental considerations, which impose severe limitations on the methodology to bring the dredged material ashore. To execute this piece of the work L&M Keating Ltd acquired a unique piece of dredge plant from the USA, (a Versi Dredge 7012), and it is intended that the dredge material will be pumped ashore from the floating plant. The existing ‘new’ pier is also presently being refurbished. Works involved include installation of a sheet-piled wall around the existing pier which will be tied into the existing structure. This will then be infilled with dredged material and a new concrete deck and steps constructed. |
| Client | Galway County Council. |
| Consulting Engineers | RPS Consulting Engineers, Elmwood House, 74 Boucher Road, Belfast, BT12 6RZ. |
| Value | €5.6m |
| Programme | 21 months |
| Date of Completion | July, 2008. |
Sub-Menu: