TERMONBARRY BRIDGE,
Co. Longford
The N5 Termonbarry Bridge Rehabilitation Contract required the
replacement of the 4 No. support bearings to the vertical lifting
span and the bridge expansion joints at the lifting span.
Removal of existing surfacing and waterproofing membrane and
reinstatement by blast cleaning, waterproofing and mastic
asphalt was required.

Also, vertical alignment consisting of removal and resurfacing of
the carriageway wearing surface and footpath realignment
works were carried out on the approach to the lifting span. Deck
drainage replacement works were also carried out along with
Mechanical and Electrical works to adjust the lifting mechanism.

As these works were located on a National Primary Route, N5, a
detailed Traffic Management Plan had to be put in place for the
duration of the works. All County Councils involved approved the
Traffic Management Plan which consisted of 50No. Diversion
Signs and 6No. VMS (Variable Message Signs) at major
junctions. These signs were put in place for the duration of
works.
Client Waterways Ireland
2 Sligo Road,
Enniskillen,
Co. Fermanagh
BT74 7JY
Consulting Engineers CEI Collins Engineers Ltd
Unit A9,
Centrepoint Business Park,
Oak Road,
Dublin 12
Value €210,000
Programme 1 Month